Summary Power plants are currently producing energy well below their capacity.
(Web Desk)- The caretaker government has directed the Finance Ministry to release Rs 10 billion to Ministry of Water and Power to deal with the ongoing electricity crisis, the state radio reported.
Prime Minister Mir Hazar Khan Khoso presided over a meeting in Islamabad today (Monday) to review energy crisis.
Prime Minister directed that all formalities pertaining to generation and production of 56.4 MW wind power project installed by Turkish Zorlu Energy Group at Jhampir be completed without delay and should be connected to the national grid system within 48 hours.
Currently, many areas are experiencing power cuts for as long as 20 hours a day amid record hot temperature.
