PM inaugurates 340MW C-4 nuclear power plant at Chashma

Dunya News

The plant would be operational on trial basis.

ISLAMABAD (Dunya News) - Prime Minister Shahid Khaqan Abbasi has inaugurated Pakistan’s fifth nuclear power plant C-4 on Friday, having capacity to generate 340MW electricity.

The Pakistan Atomic Energy Commission (PAEC) is pursuing its vision of nuclear technology for peaceful purposes and set to achieve another milestone with the operation of Chashma Nuclear Power Plant Unit-4 (C-4).

The plant would be operational on trial basis and pass through various functional and safety related tests at full power.

With tremendous efforts of PAEC and Chinese friends, the nuclear power plant C-4 would become operational and connected to the country’s power grid.

The Chashma nuclear power projects units, C-1, C-2 and C-3 have been successfully contributing to the national grid
with an excellent performance since 2000, 2011 and 2016 respectively.

The three nuclear power plants of Chinese origin are the best performing power stations in the country, supplying over
950 MW to the national grid with availability factors of around 99%.

Currently, country’s four nuclear power plants KANUPP, C-1, C-2 and C-3 are operational and generating a total of 1,030 MW of power whereas with the inauguration of C-4 Chashma plant, the power supply would be further enhanced.

Two large sized nuclear power plants, K-2 and K-3 are under construction near Karachi and are scheduled to be operational in 2020 and 2021 respectively, adding another 2,200 MW to the national grid.


WATCH VIDEO: